Econometric Analysis of Factors Affecting Social Labor Productivity in China

Qingshan LI

Abstract


Factors that affecting the social labor productivity are numerous, but in our paper, four variables which we interest in are selected for analysis, they are per capita income, urban green area, public transportation investment, and technical contract number. By the use of econometric analysis, we may find which factor is significant and which is not, and then, make some suggestions for the government.

Keywords


Social labor productivity; Affect factors; Econometric analysis; Policy suggestions

Full Text:

PDF

References


Aardenne, J. A., Camichacl, G. R., & Levy, H., et al. (1999). Anthropogenic NOX Emissions in Asian in the period 1990-2020. Atmospheric Environment, 33(4), 633-646.

Abdul, M. R., Kadir, W. P., Lee, M. S., Jaafar, S. M., & Sapuan, A. A. A. (2005). Ali. affecting construction labour productivity for Malaysian residential projects. Structural Survey, 23(1), 42-54.

Arellano, M., & Bond, S. (1991). Some tests of specification for panel data: Monte Carlo evidence and an application to employment equation. Review of Economic Studies, 58, 277-297.

Arrow, K. J. (1962). The economic implication of learning by doing. Journal of Productivity Analysis. 21, 67-89.

Barro, R., & Sala-i-Martin, X. (1995). Economic growth. New York: Mcgraw-Hill Press.

Barro, R. J. (1984). Macroeconomics. New York: Wiley.

Baumol, W. J. (1986). Productivity growth: The anatomy of urban crisis. American Economic Review, 57, 415-442.

Chan, D. W. M., & Kumaraswamy, M. M. (2003). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55-63.

Chen , Z. C., & Lin, Z. S. (2006). Multiple time scale analysis and factor analysis of energy ecological footprint growth in China 1953-2006. Energy Policy.

Philippe, A., & Howitt, P. (1992). A model of growth through creative destruction. Econometric, 60, 321-351.

Sonmez, R., & Rowings, J. E. (1998). Construction labor productivity modeling with neural networks. Journal of Construction Engineering and Management, 498-504.

Steven G. A. (1985). Why construction industry productivity is declining. Review of Economics and Statistics, 67(4), 661-669.




DOI: http://dx.doi.org/10.3968/7435

Refbacks

  • There are currently no refbacks.


Copyright (c) 2015



Reminder

  • How to do online submission to another Journal?
  • If you have already registered in Journal A, then how can you submit another article to Journal B? It takes two steps to make it happen:

1. Register yourself in Journal B as an Author

  • Find the journal you want to submit to in CATEGORIES, click on “VIEW JOURNAL”, “Online Submissions”, “GO TO LOGIN” and “Edit My Profile”. Check “Author” on the “Edit Profile” page, then “Save”.

2. Submission

Online Submissionhttp://cscanada.org/index.php/css/submission/wizard

  • Go to “User Home”, and click on “Author” under the name of Journal B. You may start a New Submission by clicking on “CLICK HERE”.
  • We only use four mailboxes as follows to deal with issues about paper acceptance, payment and submission of electronic versions of our journals to databases: [email protected]; [email protected]; [email protected]; [email protected]

 Articles published in Canadian Social Science are licensed under Creative Commons Attribution 4.0 (CC-BY).

 

Canadian Social Science Editorial Office

Address: 1020 Bouvier Street, Suite 400, Quebec City, Quebec, G2K 0K9, Canada.
Telephone: 1-514-558 6138 
Website: Http://www.cscanada.net; Http://www.cscanada.org 
E-mail:[email protected]; [email protected]

Copyright © Canadian Academy of Oriental and Occidental Culture