Building up a Performance Indicator System of International Projects, Based on the Balanced Scorecard

Hui LI

Abstract


This paper is established on the in depth analysis of Balanced Scorecard(BSC)in which the BSC has been made necessary amendments so as to be use in establishing the performance indicator system of projects. This paper preliminarily builds up a performance indicator system based on performance scorecard considering the characteristics of international projects.Keywords: international projects; balanced scorecard; performance indicator

Keywords


international projects; balanced scorecard; performance indicator

Full Text:

PDF


DOI: http://dx.doi.org/10.3968/j.mse.1913035X20100402.007

Refbacks

  • There are currently no refbacks.


Copyright (c)




Share us to:   


Reminder

  • We are currently accepting submissions via email only.

    The registration and online submission functions have been disabled.

    Please send your manuscripts to [email protected],or [email protected]  for consideration.

    We look forward to receiving your work.

 


We only use three mailboxes as follows to deal with issues about paper acceptance, payment and submission of electronic versions of our journals to databases:
[email protected]; [email protected]; [email protected]

 Articles published in Management Science and Engineering are licensed under Creative Commons Attribution 4.0 (CC-BY).

 MANAGEMENT SCIENCE AND ENGINEERING Editorial Office

Address:1055 Rue Lucien-L'Allier, Unit #772, Montreal, QC H3G 3C4, Canada.

Telephone: 1-514-558 6138
Http://www.cscanada.net Http://www.cscanada.org

Copyright © 2010 Canadian Research & Development Centre of Sciences and Cultures