Case Study: A Fast Calculation Method on Optimizing Inflowing Control Parameters for Staged Premium Screen
Abstract
Staged premium screen technology has been widely used in Shengli Oilfield, and works as a reliable method for sectional inflow control completion in horizontal wells. The completion plan of staged premium screen were originally optimized by flow loop test, however, the test procedure is usually as long as 12 working days. Therefore, a fast calculation method with processing time of no more than 2 days is proposed. When the well bore segmentation scheme is available, screen number as well as base pipe hole density are selected as the key parameters, and are optimized from one interval to the next on the basis of inflow control characteristics formula of staged premium screen. During the optimization of each interval, the parameters which best fit the requirements of “reasonable inflow control pressure drop” and “maximum discharge area” are determined from many alternative values. G6-P15 well, designed under the guidance of fast calculation method, obtained more balanced fluid and oil production profile versus Reference Well G6-P12. So far, 15 wells have been designed by this fast method. On average, the annual decline rate of daily oil production, the annual increase rate of water cut as well as annual mean of water cut of application wells are observed to be 36.7%, 9.4% and 7.9% lower than those of reference wells, respectively, while the annual accumulation oil production of target wells is 12.2% higher than that of reference wells. These successful applications prove that the fast calculation method has provided reasonable design.
Keywords
Full Text:
PDFReferences
Augustine, J. R., McIntyre, A., Adam, R. J., & Laidlaw, D. (2006, January). Increasing oil recovery by preventing early water and gas breakthrough in a West Brae horizontal well: A case history. In SPE/DOE Symposium on Improved Oil Recovery. Society of Petroleum Engineers.
Raffn, A. G., Zeybek, M., Moen, T., Lauritzen, J. E., Sunbul, A. H., Hembling, D. E., & Majdpour, A. (2008, January). Case histories of improved horizontal well cleanup and sweep efficiency with nozzle based inflow control devices (ICD) in sandstone and carbonate reservoirs. In Offshore Technology Conference. Offshore Technology Conference.
Davila, E., Almeida, R., Paz, F., Vela, I., Pazos, J., Proano, G., ... & Chillenato, F. (2009, January). First applications of inflow control devices (ICD) in open hole horizontal wells in block 15, Ecuador. In Latin American and Caribbean Petroleum Engineering Conference. Society of Petroleum Engineers.
Wu, R., Turpin, A., MacDonald, D., & Kavanagh, D. (2011, January). A procedure for the configuration of an inflow control device completion using reservoir modelling and simulation in the North Amethyst Pool. In SPE Reservoir Characterisation and Simulation Conference and Exhibition. Society of Petroleum Engineers.
Gomez, M., Florez Anaya, A., Araujo, Y. E., Parra Moreno, W., Bolanos, V., & Landaeta, L. (2014, September). Passive inflow control device (ICDs) application in a horizontal wells completions in the Rubiales area heavy-oil reservoir. In SPE Heavy and Extra Heavy Oil Conference: Latin America. Society of Petroleum Engineers.
MoradiDowlatabad, M., Zarei, F., & Akbari, M. (2015, April). The Improvement of Production Profile While Managing Reservoir Uncertainties with Inflow Control Devices Completions. In SPE Bergen One Day Seminar. Society of Petroleum Engineers.
Feifei, C., Yonggang, D., Junbin, Z., & Weifeng, W. (2015). Application of neural network and fuzzy mathematic theory in evaluating the adaptability of inflow control device in horizontal well. Journal of Petroleum Science and Engineering, 134, 131-142.
Luo, W., Li, H. T., Wang, Y. Q., & Wang, J. C. (2015). A new semi-analytical model for predicting the performance of horizontal wells completed by inflow control devices in bottom-water reservoirs. Journal of Natural Gas Science and Engineering, 27, 1328-1339.
Wang, J., Liu, H., Liu, Y., Jiao, Y., Wu, J., & Kang, A. (2016). Mechanism and sensitivity analysis of an inflow control devices (ICDs) for reducing water production in heterogeneous oil reservoir with bottom water. Journal of Petroleum Science and Engineering, 146, 971-982.
Maalouf, C. B., Zidan, M., Uijttenhout, M., Hernandez, E. J., Al-Jaberi, S., Saeed, Y., & Graham, R. A. (2017, November). Responsive Design of Inflow Control Devices Completions for Horizontal Wells. In Abu Dhabi International Petroleum Exhibition & Conference. Society of Petroleum Engineers.
Li, Q., Xiao, J., Zeng, Q., & Xiao, C. (2018). Performance of Horizontal Wells with Inflow Control Devices in Homogeneous Reservoirs with Bottom Water Drive. Arabian Journal for Science and Engineering, 43(5), 2473-2479.
Zeng, Q., Wang, Z., Wang, X., Wei, J., Zhang, Q., & Yang, G. (2015). A novel autonomous inflow control device design and its performance prediction. Journal of Petroleum Science and Engineering, 126, 35-47.
Iqbal, F., Iskandar, R., Radwan, E., Abbas, H., Douik, H., Least, B., & Mohamed, Z. (2015, November). Autonomous Inflow Control Device-A case study of first successful field trial in GCC for water conformance. In Abu Dhabi International Petroleum Exhibition and Conference. Society of Petroleum Engineers.
Zhao, L., Zeng, Q., & Wang, Z. (2017). Design and Performance of a Novel Autonomous Inflow Control Device. Energy & fuels, 32(1), 125-131.
Barreto, C. E. A. G., & Schiozer, D. J. (2015). Optimal placement design of inflow control valve using a dynamic optimization process based on technical and economic indicators. Journal of petroleum science and engineering, 125, 117-127.
Nugraha, I., AlBassam, T. K., Gallelli, A., & Mathiesen, V. (2016, April). Optimizing Reservoir Performance through Utilization of Autonomous Inflow Control Valve–Lessons Learnt from the World’s First Installation. In SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition. Society of Petroleum Engineers.
Kais, R., Mathiesen, V., Aakre, H., Woiceshyn, G., Elarabi, A., & Hernandez, R. (2016, September). First autonomous inflow control valve AICV well completion deployed in a field under an EOR water & CO2 injection scheme. In SPE Annual Technical Conference and Exhibition. Society of Petroleum Engineers.
Chen, Y., Wang, S. X., Deng, G. L., Chen, Z. Y., Zhang, J. G., & Li. W. (2016). A new test apparatus for evaluating premium screen performance. Advances in Petroleum Exploration and Development, 11(1), 30-34.
Chen, Y., Peng Z. G., Guo, L. Q., Zhang J. G., Li W., & Wang, S. X. (2014). Design of static flow control parameters for equilibrium fluid supply completion of horizontal wells. Oil Drilling & Production Technology, 36(6), 45-49.
Wan, R. P. (2001). Handbook of petroleum production technology. Beijing: Petroleum Industry Press.
Moradi, M., Konopczynski, M., Mohd Ismail, I., & Oguche, I. (2018, December). Production Optimisation of Heavy Oil Wells Using Autonomous Inflow Control Devices. In SPE International Heavy Oil Conference and Exhibition. Society of Petroleum Engineers.
DOI: http://dx.doi.org/10.3968/11570
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Yang CHEN
This work is licensed under a Creative Commons Attribution 4.0 International License.
Reminder
- How to do online submission to another Journal?
- If you have already registered in Journal A, then how can you submit another article to Journal B? It takes two steps to make it happen:
1. Register yourself in Journal B as an Author
- Find the journal you want to submit to in CATEGORIES, click on “VIEW JOURNAL”, “Online Submissions”, “GO TO LOGIN” and “Edit My Profile”. Check “Author” on the “Edit Profile” page, then “Save”.
2. Submission
- Go to “User Home”, and click on “Author” under the name of Journal B. You may start a New Submission by clicking on “CLICK HERE”.
We only use three mailboxes as follows to deal with issues about paper acceptance, payment and submission of electronic versions of our journals to databases:
[email protected]; [email protected]; [email protected]
Articles published in Advances in Petroleum Exploration and Development are licensed under Creative Commons Attribution 4.0 (CC-BY).
ADVANCES IN PETROLEUM EXPLORATION AND DEVELOPMENT Editorial Office
Address:1055 Rue Lucien-L'Allier, Unit #772, Montreal, QC H3G 3C4, Canada.
Telephone: 1-514-558 6138
Website: Http://www.cscanada.net
Http://www.cscanada.org
E-mail:[email protected]; [email protected]
Copyright © 2010 Canadian Research & Development Centre of Sciences and Cultures